military

Future Requirements Of Coast Guard Vessels

"The problem is change and how to cope with it. I have learned that 90 percent of problem solving is realizing that you have a problem," stated Adm. James S. Gracey, Commandant, U.S. Coast Guard, at the 1983 Society of Naval Architects and Marine

 

Tano Gets Contract For Vessel Control Systems

Tano Corporation of Metairie, La., has been awarded a contract to design and manufacture centralized control systems for two refrigerated containerships. The vessels are being built by Bethlehem Steel Corporation's Sparrows Point, Md., shipyard for Farrell Lines Incorporated.

Wagner Wins $4.5-Million Contract For Steering And Control Systems

—Literature Available Wagner Engineering Ltd. of North Vancouver, B.C., Canada, has announced that it has been selected by Saint John Shipbuilding Limited to supply the steering systems as well as integrated steering control systems for six patrol frigates being built for the Canadian Navy.

 
 
MEBA meeting member members mexico military mission naval naval architects naval architecture navigation